Same design as to what my house will look like

Updated

Well it's been progressing slow, well slow for us anyway. All the internal painting and electrical wiring has been completed. Things that need to be done
- Plumbing  toilets, taps and spa,
- Kitchen splash back tiling
- Bathroom tiling
- Kitchen and bathroom bench tops
- Oven and range hood installed
- Carpet in bed rooms, leisure and first room
- Window blinds and fly screens
- Locks on the doors
- Front and rear garage doors

We will be doing the timber flooring (once we have the keys) and driveway, water tank and landscaping will get done further down the track.

Foxtel booked for 31/7/10 

No comments:

Post a Comment

Followers

alternative description of the image