Well it is just about done........ only thing I have issues is with the front render, but I'm sure that will get fixed.
Just waiting for a inspection and then we can move in.
Major jobs ahead
- Dig out about 2 meters long x 90cm deep of dirt and clay so we have move access at the back. We have
a pool that is ( now) built up after the block was leveled.
- Driveway
- Concrete sideways
- Deck outside the rear timber door entry
- Change all crappy globes to strong one's
- Design the front garden ( wife's job)
- Timber flooring
- Window blinds and fly screens
- Locks on the doors
- Front and rear garage doors
Same design as to what my house will look like
I love your house, it's perfect!
ReplyDeleteYou could have some real fun with that Darker grey roof, good to abstain rain water.
Clearwater Fla Real Estate
If you need and help with the rendering try The Builders SW who are specialist renderers in South Devon and the South West
ReplyDelete